A new build renewable plant in Glasgow which collects waste from the city and produces clean energy for the surrounding areas.

The contract required full-time management to oversee the installation of circa 1.4 kilometres of thermal insulation. The purpose of the insulation was to ensure heat conservation, personnel protection and the maintenance of critical temperatures; we used a variety of products such as prefabricated sheet metal cladding. Over 50 vessels and tanks were insulated both internally and externally and the valves and flanges were insulated with a combination of prefabricated removable boxes and flexible covers.


Integrating trace heating within our initial application plans allowed the programme and essential protective covering to be completed, avoiding all delays. Despite the required variety of materials, we delivered all works on time with no incidents, accidents, first aid or non- conformance, underpinning our commitment to our right-first-time approach.