Location:

Worthing

Our client has a new facility for research development focussed on the production of innovative pharmaceutical vaccines and health products. We designed and installed several process systems of pipework and vessels.

The contract required full-time management to oversee the installation of 2000 linear metres of thermal insulation. For the purpose of heat conservation, personnel protection and maintaining critical temperatures we used a variety of products such as armaflex, mineral wool and clad, with bespoke prefabricated sheet metal cladding. In addition, we supplied access solutions through our scaffolding operations and further support was provided by the protective coating team tasked with painting over 2000 welds.


The congested site conditions and time frame for completion were overcome with careful planning and coordination, through all parties working on several systems simultaneously. The review of specifications and protective covering in a non-traffic area provided savings, increased productivity and reduced programme time.